Not every section has easy access - and that's okay.
We have a range of delivery options to suit different sites, locations and access conditions.
All we really need is 1 metre of access. If you can walk there, we can probably deliver there.

With our Pre-Built Transportable option, around 98% of your home is completed off-site in a controlled yard environment before it arrives at your section.
This means:
On-site build time can be reduced to around 2–3 days, rather than the 4–6 weeks typically required for an on-site build.
Once the home arrives, the remaining on-site work is mainly:
Delivery cost includes piling work, concrete and digger hire.

Our 20ft container and Hiab trailer option delivers your home as flat-packed panels, with the remaining materials safely packed inside the container.
This option includes:

With the 40ft container option, the panels and building materials are packed into a single 40ft container.
This is a great option for:
The container also provides secure on-site storage for your materials during the build.
Container hire is included for the agreed hire period.

For smaller or more accessible deliveries, we can deliver your materials using a ute and 6m trailer.
This option is ideal for:

No two sites are the same, and difficult access doesn't necessarily mean we can't deliver. As long as we have around 1 metre of access, we'll look at how we can make it work.
If you're unsure whether your site is accessible, send us some photos.
Our team can review your access and work with you to find the best custom delivery option for your site.
Send us your site photos and let's see what's possible.